Multiple jobs per clients optimised by material

Gathering votes

We run big projects for multiple clients.
It would be nice to see a function that can have multiple Jobs per client and then optimizing by material..

Jobs generally consists of 1 items materials with 50 - 70 components being optimized for cutting.
Optimizing multiple Jobs from more than one client reduces the waste of material as a separate job would have required 50 sheet to cut with 30% waste.

The 30% could have been used on a different job for the same or different client that will reduce the waste to 10% or less.

Please advise if this is possible currently or if this in the roadmap for future versions.

MaxcutSoftware Admin

4 years ago

No votes yet
Categories
Feature Request