Hello,
I think that it could be useful to add some simple features in this category.
Labor = (value 1 x value 2) /60* x value 3
Value 1 = number of panels
Value 2= used time per Value 1 (unit min)
60- to get results in (h)
Value 3 = Labor cost per hour
With this option users can easily get much more important information such as approx. time estimation for each operation (total labor costs per each operation) expressed in a time (h) unit. and costs that can be printed in the job summary.
Example:
Operation Cutting (example 25min per sheet)
Operation edging (example 7m/min)
Operation CNC drilling: (example 3min/panel)
Assembly: (example 3min/panel)
... as many operations user need ...
Example:
Job:
5 sheets
55 m
43 panel
Result:
labor 1 cutting: (5x25)/60*100$=
Time: 2.08 hours
Labor Cost: $208.33
labor 2 edging: (7/55)/60*90$=
Time: 0.12h
Labor Cost: $11.45
I think that results can be very useful for making estimations and organization